The light source of the garden light should be low power, high color rendering, high-pressure sodium lamp, metal halide lamp, high-pressure mercury lamp, incandescent lamp, etc.
The junction box or fuse box of the lamp, and the waterproof gasket of the box cover should be completely installed. The street lamps on the overhead line poles should be in the correct position, be fixed reliably, and have complete and tightened fasteners, and each set should be protected by a fuse.
The street lamps on the overhead line poles should be in the correct position, be fixed reliably, and have complete and tightened fasteners. Each set of lamps should be protected by fuses.
The grounding line should be set as a separate trunk line, the trunk line should be arranged along the garden lights to form a ring network, and the grounding trunk line should be connected to the grounding device lead-out trunk line at no less than 2 places.
Power-on test run After the installation of the lamps and lanterns is completed, the power-on test run is allowed only after passing the insulation test inspection. After the power is turned on, it should be carefully checked and patrolled to check whether the control of the lamps is flexible and accurate.